![indian trails public library district](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499362779192-ARE3XSOO7HYWHTYX7BUL/414+copy.jpg)
![431 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499362950918-I4OSJLK1785YXW0QRRTI/431+copy.jpg)
![439 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499362877799-EMVEBZTBBNB7Q7XC52DI/439+copy.jpg)
![152 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499368121463-X3LE7TK4VS0ZE4N0VUAX/152+copy.jpg)
![145 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1701375885185-QM19DLZES07B58021V3S/145+copy.jpg)
![469 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499367811105-W70F05LSXFC5ZDDUG8FZ/469+copy.jpg)
![438 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499367702791-R534KY8HN1O4PZ1O20JY/438+copy.jpg)
![239 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499367106017-XAHE0N58FBY2BCFUXIK3/239+copy.jpg)
![504 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499368050338-6OZOMURSJE1LX9PTOBR8/504+copy.jpg)
![311 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499367207588-VCZK4PVJKO46EMR02ATY/311+copy.jpg)
![353 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499367615956-7OT5CIXW8E6REF4R0YAF/353+copy.jpg)
![350 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499367551116-XOE0LE0D0FC0YM5Y4347/350+copy.jpg)
![528 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499369245898-I03BCVEYC64OU19HLM4X/528+copy.jpg)
![458 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499369119190-7MOUKWF1NRRB7WU9750L/458+copy.jpg)
![187 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499368289515-ZN567CTZN9X2D1SV44C2/187+copy.jpg)
![256 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499368356912-AFP0NPWS2Y8ZM7LMONBQ/256+copy.jpg)
![220 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499368718463-XDBU42NTUMD9FSEKI0YG/220+copy.jpg)
![289 copy.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499368444461-07AI5K63WZ3VDDPELZ1Q/289+copy.jpg)
![nw axon level 1.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1478278432373-TR2NMIZ969LWWLHE3P4L/nw+axon+level+1.jpg)
![nw axon level 2.jpg](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1478278435283-6UWAA2SU2Y4Q6WD08E5U/nw+axon+level+2.jpg)
![indian trails public library district](https://images.squarespace-cdn.com/content/v1/58176c61893fc013e682d460/1499362779192-ARE3XSOO7HYWHTYX7BUL/414+copy.jpg)
Wheeling, IL
project 1 : (2014) Master Plan Library Project with Cost Estimate: $14,780,000 total project budget
project 2 : (2017) 15,000 SF Building Addition and Interior Renovation + Furniture Package
66,000 sf / $14,503,000 total - $219/ SF
description:
project 1: The initial phase of the project was to perform a master plan study and building assessment to understand the current condition of both the infrastructure and the function of the existing Library. Through collaboration with staff and administration, a building program was developed that represents the future needs and direction of the Library. Product Architecture + Design then developed plans and cost models for various levels of renovation and additions for review by the board of trustees. Ultimately, a combination of projects c & d were selected representing a full building renovation and along with a new 15,000 SF/2 level addition.
project 2: Full Interior Renovation and Building Addition:
The building renovation project at the Library is currently under construction. The finished project will include a new divisible large meeting rooms, 8 study rooms, a training lab, maker space and an ESL classroom along with lots of open seating and areas to lounge. The existing site was also redesigned to fix a non-functioning traffic flow while adding a new vehicular book drop off and pedestrian plaza.
sustainability: Completed sustainable initiatives in the project include a new HVAC system with geothermal loop, replacement of all light fixtures with LED, and electric solar panels. The proposed energy reductions over the current usage at the Library illustrate a benchmark in community leadership and dedication to the health of the planet..